Democratic New York Rep. Alexandria Ocasio-Cortez blamed the Keystone XL pipeline for leaking about 5,000 barrels of oil in rural South Dakota about two years ago.
There’s just one problem: The Keystone XL pipeline has not been built yet.
During a House hearing Tuesday, Ocasio-Cortez claimed that “Keystone XL, in particular, had one leak that leaked 210,000 gallons across South Dakota” while she questioned Wells Fargo President and CEO Timothy Sloan.
.@RepAOC: "Mr. Sloan, why was the bank involved in the caging of children?" @AOC to #WellsFargo CEO pic.twitter.com/Pvfuv2wfXe
— Alexis Goldstein (@alexisgoldstein) March 12, 2019
Ocasio-Cortez probably confused the Keystone XL pipeline with the Keystone pipeline, which has been operating since 2010. Keystone XL is still under construction, but would also bring oil sands from Canada to Nebraska where it would connect to existing pipeline.
Massachusetts police officer shot by colleague during service of restraining order
Barry Morphew to appear in court after grand jury indictment charging him with wife’s murder
Critics sound off against Trump’s ‘temporary pass’ for migrant farm, hospitality workers
‘Biden wanted me in here:’ Trump says inside caged ‘Alligator Alcatraz’ detention site
Schumer forces name change for ‘big, beautiful bill’ moments before it passes
Trump at ‘Alligator Alcatraz’: ‘Deportation’ is the only way out for illegal immigrants
Trump Says He’s Going to ‘Take a Look’ at Deporting Elon Musk
Watch: Reporter Travels to ‘Alligator Alcatraz’ and Finds Out the Name Fits
Iran-linked hackers threaten to release new trove of emails stolen from Trump’s inner circle after strikes
Elon Musk’s attacks on Trump’s ‘big, beautiful bill’ have ‘no basis,’ says No 2 House Republican
Suspect in Deadly Idaho Firefighter Ambush Identified: ‘Something Must Have Snapped’
Two Chinese nationals arrested for spying on US Navy personnel and bases
Victim’s Family ‘Beyond Furious’ as Bryan Kohberger Accepts Plea Deal in Idaho Quadruple Murder Case
Trump Threatens Iran in Scathing Post, Demands Thank You for Sparing Supreme Leader ‘A Very Ugly’ Death
4 Senate amendments to Trump megabill that failed — and 1 that passed
Environmentalists spent years opposing the Keystone XL pipeline, filing court challenges and successfully lobbying former President Barack Obama to personally reject the project in late 2015. President Donald Trump reversed that decision in early 2017, but Keystone XL’s progress has since been delayed by activist lawsuits.
The existing Keystone pipeline, however, was responsible for leaking up to 9,700 barrels in South Dakota in 2017. The initial estimate for the spill was about 5,000 barrels, or 210,000 gallons of oil. Both Keystone and the planned XL line are operated by Canadian pipeline giant TransCanada.
TransCanada said it repaired the pipeline and cleaned up the spill, Reuters reported in 2018, though the event has been used by environmental activists to gin up opposition to the Keystone XL pipeline.
Ocasio-Cortez, who recently introduced the Green New Deal resolution, also took aim at Wells Fargo’s financing of the Dakota Access Pipeline, which sparked violent protests along the project’s planned route throughout 2016.
Like Keystone XL, the Trump administration reversed the Obama administration’s blocking of the project. Dakota Access went into service in 2017. TransCanada had plans to begin building the Keystone XL pipeline later this year, but a February federal court ruling could delay construction until 2020.
Ocasio-Cortez also grilled Wells Fargo’s Sloan over their financing of the Dakota Access Pipeline, asking the bank CEO if his company should be responsible for cleaning up any oil spills. The freshman Democrat also claimed the Dakota Access Pipeline has leaked five times since it began operating two years ago.
“So, hypothetically, if there was a leak from the Dakota Access Pipeline, why shouldn’t Wells Fargo pay for the cleanup of it, since it paid for the construction of the pipeline itself?” Ocasio-Cortez asked in Tuesday’s hearing.
“We don’t operate the pipeline, we provide financing to the company that’s operating the pipeline,” Sloan said, also noting Wells Fargo had an environmental oversight group.
Story cited here.